FPL - Cedar Bay Generating Plant Demolition 
  • Salvage and recovery of equipment for resale.
  • Removal, handling, and disposal of hazardous and regulated materials.
  • Demolition of 250 MW power plant, including baghouse structures, 3 coal-fired boiler units, 425 ft tall stack, and turbine structure.
  • Demolition of
Turkey Point Nuclear Power Station 
  • Contracted to safely segment, size reduce, and package radiological contaminated steel comprising all of the vessels, mechanical and electrical systems, and structural supports for the Unit 3 & Unit 4 Clarifier/Demineralization systems.
  • Work was performed inside the protected area
Santee Cooper Jefferies Generating Station 
  • Asbestos abatement of entire facility.
  • Complete demolition of 4 coal fired generation units totaling 346 MW.
  • Demolition is estimated to produce 16,500 tons of scrap steel and an estimated 14,000 cubic yards of concrete.
  • Full site restoration, including the placement
FPL Putnam Plant Abatement & Demolition 
Phase 1
  • Asbestos abatement.
  • Hazardous & regulated materials removal (PCBs, sulfuric acid, mercury).
  • Recovery of sellable assets

Phase 2
  • Demolition of 6 combined cycle (natural gas, coal, fuel oil) 500 MW power generation units, including boilers,