Duane Arnold Nuclear Energy Center 
  • DEMCO was contracted to provide skilled instrument and control technicians to test, calibrate, and replace components integral to the function of critical and sensitive systems throughout the complex.
  • This work was accomplished as part of an accelerated critical path outage
FPL - Cedar Bay Generating Plant Demolition 
  • Salvage and recovery of equipment for resale.
  • Removal, handling, and disposal of hazardous and regulated materials.
  • Demolition of 250 MW power plant, including baghouse structures, 3 coal-fired boiler units, 425 ft tall stack, and turbine structure.
  • Demolition of
General Electric Labor Support 
  • The plant includes two, natural gas fueled, GE 7H combined-cycle power blocks for a total maximum net rated electrical output of 775 MW. This marks the first installed application of the H System gas turbine technology in a 60 Hz machine, as well as the first installation in the
Turkey Point Nuclear Power Station 
  • Contracted to safely segment, size reduce, and package radiological contaminated steel comprising all of the vessels, mechanical and electrical systems, and structural supports for the Unit 3 & Unit 4 Clarifier/Demineralization systems.
  • Work was performed inside the protected area