Santee Cooper Jefferies Generating Station 
  • Asbestos abatement of entire facility.
  • Complete demolition of 4 coal fired generation units totaling 346 MW.
  • Demolition is estimated to produce 16,500 tons of scrap steel and an estimated 14,000 cubic yards of concrete.
  • Full site restoration, including the placement
Ford DAP D&D 
  • Performed abatement oversight for 40,000 linear feet of pipe insulation, 10,000 square feet of duct insulation and 30,000 square feet of VAT and tank insulation.
  • Removed all universal and hazardous wastes, including PCBs, ballasts and mercury switches.
  • Removed and disposal
FPL Putnam Plant Abatement & Demolition 
Phase 1
  • Asbestos abatement.
  • Hazardous & regulated materials removal (PCBs, sulfuric acid, mercury).
  • Recovery of sellable assets

Phase 2
  • Demolition of 6 combined cycle (natural gas, coal, fuel oil) 500 MW power generation units, including boilers,
SUNY - BUFFALO REACTOR DEMOLITION 
  • Project oversight and skilled labor support for the reactor demolition at the Buffalo Medical Research Center, which was located at the center of an operational university.
  • Demolished and removed over 9,500 tons of debris from site.
  • Demolished, packaged and shipped over