7397 Seneca Street, East Aurora NY 14052 Ph: (716) 674-0883 Fx: (716) 674-0884 GCallahan@demcoinc.com
Projects Home
Southwest Brooklyn Incinerator Demolitio

  • Decommissioned electro-static precipitators, gas conducting towers, four incinerator furnaces, and all ancillary equipment, which were contaminated with PCB’s, heavy metals, petroleum compounds and asbestos.
  • Demolished 50,000 square foot incinerator building.
  • Demolished two 200-foot brick stacks, utilizing a remote system comprised of a crane equipped with 280 feet of boom and a specialized processor, which systematically demolished the stacks, dropping all of the debris into the structure.
  • Utilized specialized lift plans to rig and remove the suspended conveyor system, which extended from the building out over the adjacent waterway.
  • Backfilled a 2,500 cubic yard refuse receiving bin.