Kodak Park

  • Performed 100% of project utilizing own forces.
  • 86,500 man-hours performed without a lost time accident.
  • Performed demolition operations in PPE, due to silver nitrate contamination.
  • Performed numerous engineered lifts utilizing 150-ton hydraulic cranes.
  • Demolished structures within confined spaces, surrounded by live equipment.
  • Coordinated utility and production shutdowns, prior to demolition, to accommodate facility schedules.
  • All work performed within working production facility, without interruption of work.