7397 Seneca Street, East Aurora NY 14052 Ph: (716) 674-0883 Fx: (716) 674-0884 GCallahan@demcoinc.com
Projects Home
DuPont - Belle

  • Dismantlement of precipitator with breeching connected to an operating Power House.
  • Performed work over live pipe racks, utilizing a 175-ton hydraulic crane and 131í manlift.
  • Performed confined space work while dismantling the precipitator breeching.
  • Dismantled coal conveyor system which ran over water, simultaneously utilizing 175-ton and 300-ton hydraulic cranes.
  • Selective pipe was removed from live racks.
  • Demolished a 2-million gallon tank, utilizing a track-mounted shear and grapple.
  • Demolished the Dry Benlate Building, utilizing a wrecking ball. Torch cuts were also made on this structure to control the demolition.
  • Crews performed demolition operations in supplied air, due to PCB and heavy metal contamination.
  • Crew managed DuPontís on-site, state approved landfill.