Home
Projects
 
  DuPont - Belle
 
Owner EI DuPont Specialty Chemicals
Location Belle, West Virginia
Duration February 2000 - December 2003
Value $3,000,000
Highlight Performed Demo Operations in Supplied Air, Due to Heavy Metal Contamination
Contact Us
 
 
  Item Description
  * Dismantled precipitator with breeching connected to an operating Power House. Work was performed over live pipe racks, utilizing a 175-ton hydraulic crane and 131í manlift.
* Performed confined space work while dismantling the precipitator breeching.
* Dismantled coal conveyor system from over water, simultaneously utilizing 175-ton and 300-ton hydraulic cranes.
* Selective pipe removal from live racks.
* Demolished a 2-million gallon tank, utilizing a track-mounted shear and grapple.
* Demolished Dry Benlate Building, utilizing a wrecking ball. Torch cuts were also made on this structure to control the demolition.
* Performed demolition operations in supplied air, due to PCB and heavy metal contamination.
* Managed DuPontís on-site, state approved landfill.
 
  Back to Projects
 
 
Corporate Info | Services | Projects | Safety | Power Services | Industrial Equipment Sales | Contact
 

Copyright © DEMCO

 

Web Development by  ACEN