7397 Seneca Street, East Aurora NY 14052 Ph: (716) 674-0883 Fx: (716) 674-0884 GCallahan@demcoinc.com
Projects Home
Beaumont Hotel Implosion

  • Prepared 13-story hotel building for implosion by drilling over 750 holes into reinforced concrete holes.
  • 336 pounds of explosives were placed and the building was demolished within 7 seconds.
  • Coordinated and implemented the Project Safety Implosion Plan with city, police and fire officials.
  • Performed seismographic surveys to ensure no structural damage to surrounding buildings.
  • Designed and successfully implemented an Implosion Protection Plan to protect the surrounding buildings during the implosion.
  • Removed over 1,300 truckloads of building debris.