General Mills Rooftop Conveyor Dismantlement

  • Removal of rooftop conveyor system from the top of 160 high operational grain processing facility, utilizing three 250-ton hydraulic cranes.
  • Dismantlement of rooftop 4-story Lofton Leg Building.
  • Dismantlement of Conveyor Building which hung over truck loading facility.
  • All debris generated by the dismantlement was safely removed via cranes equipped with skid pans. This included the removal of 280 tons of steel and 520 cubic yards of concrete.
  • Hot cutting required extensive protection to ensure the safety and health of all employees and the physical property of the operational grain processing facility.
  • Performed over 9,000 man hours without any safety incidents.