7397 Seneca Street, East Aurora NY 14052 Ph: (716) 674-0883 Fx: (716) 674-0884 GCallahan@demcoinc.com
Projects Home
Green Mountain Wind Farm Turbine Demolition

  • Complete demolition of eight 180 feet tall wind turbines, and two 200 feet tall MET Towers.
  • Demolition and size reduction of over 750 CY of concrete debris.
  • Transportation and recycling of approximately 1,450 tons of steel.
  • Collection and disposal of approximately 350 gallons of gear oil, 200 gallons of hydraulic oil and 60 gallons of antifreeze.
  • Coordination with both NextEra and the Landowner to ensure all parties approved the final state of property.
  • Worked through uncooperative weather conditions on a daily basis.
  • Project was successfully completed, ahead of schedule, with zero safety, compliance, or dust complaints.