7397 Seneca Street, East Aurora NY 14052 Ph: (716) 674-0883 Fx: (716) 674-0884 GCallahan@demcoinc.com
Nuclear Decommissioning Home
Rocky Flats 771/774 Building

D&D of 771/774 Complex – Plutonium Production Facility Building, formerly known as “The Most Dangerous Building in the Free World”
  • Decontaminate and strip out of process support systems, safety systems, utilities, equipment, piping, electrical systems, interior partitions, CMU walls, and interior concrete walls/slabs from Plutonium production facility.

  • Demolish 300,000 square feet, reinforced concrete facility.

  • Removal, packaging, and disposal of ACM, used in process equipment insulation and in building walls, ceilings and roof.

  • Removal of contaminated soil and piping below floor slabs.

  • Backfill area and site restoration.

  • Handle, sort, segregate, size and transport, on-site, RAD contaminated debris generated by the demolition operations.

  • Manage waste streams for proper disposal.

  • Design and implement Fugitive Dust Control Plan and Storm Water Run Off Plan for all phases of project.

  • Develop and implement Site Specific Health & Safety Plan, Work Plans and Hazard Assessment Plan.